The London House - 7
This Old House - Season 13

DESCRIPTION

Our master carpenter shows us the details of the new staircase leading up to the flat. Carla goes through the lighting plan for the entire flat. David Booth reviews the front wall and discusses the kitchen installation. Tiler Terry Hallow works in the master bathroom, while the guys inspect the hardwood flooring and trim and stainless steel hardware. We then visit the Thames Barrier. New steel beams are fitted in the front wall, and only a few feet away, Jeremy looks at the recently installed kitchen. Design consultant Peter Leonard walks through the flat with Carla.